Skip to content

Fervo cape station 500 MWe#73

Closed
softwareengineerprogrammer wants to merge 13 commits into
mainfrom
fervo-cape-station-500-mwe
Closed

Fervo cape station 500 MWe#73
softwareengineerprogrammer wants to merge 13 commits into
mainfrom
fervo-cape-station-500-mwe

Conversation

@softwareengineerprogrammer

@softwareengineerprogrammer softwareengineerprogrammer commented May 15, 2025

Copy link
Copy Markdown
Owner

Description

Addresses NatLabRockies#385

Requirements:

  1. Water loss 10-20%
  2. Casing size = 9.625 inches
  3. Minimum net electricity generation ≥ 500 MWe
  4. Drawdown requiring redrilling at 5-10 years: image
  5. LCOE ≤ $80/MWh ($78.20/MWh)
  6. Capex ≅ $4500/kW (~$4550/kW, depending on whether nominal 500MW net or actual 504 MWe minimum net generation is used)

Other changes:

  1. Real Discount Rate = 8% (higher than default 7%).
    1. TODO: this is intended to be equivalent to 8% inflated equity interest rate from BICYCLE, is this the appropriate mechanism/value?
  2. TODO: decide whether to retain ITC = 30%
  3. Starting electricity sale price = $120/MWh (down from $150/MWh)

Testing & Verification

https://gtp.scientificwebservices.com/geophires/?shared-geophires-result-id=826d7407-9133-4705-99fe-c297bb28fb2d

@softwareengineerprogrammer softwareengineerprogrammer changed the base branch from missing-percent-unit-fixes to main May 21, 2025 14:57
@softwareengineerprogrammer

Copy link
Copy Markdown
Owner Author

Rebased and closed in favor of #74

@softwareengineerprogrammer softwareengineerprogrammer deleted the fervo-cape-station-500-mwe branch June 18, 2025 20:46
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

enhancement New feature or request

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant